Monday, 18 October 2010

Children's Film: Filming Day 1

Today we began filming our children's film opening sequence. So far we are right on schedule and have been able to finish all of our superhero scene. We were very careful to follow our plan as closely as possible, and tried to use a wide range of angles and locations.

Before our filming began we sorted out the costumes, which I have posted about here. We all brought in a range of different items to create the costumes, which I think have turned out really well.

From filming today I think that our classification might need to be changed from PG to U. This is because we have not used any discrimination and have used minimal violence, and so I believe that the opening sequence would better fit into the U classification. We will later confirm this.

No comments:

Post a Comment

 
© 2009 12S1-64 CHILDRENS FILM 2010/11. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz